Foundation Systems of Michigan removed the plastic and all the building debris that had probably been there since 1973, raked out the dirt to give it a more level appearance, and then laid a special plastic flooring and insulated the walls. We even had a light bulb and outlet installed in the south crawl.
Looking in the south crawl, panning left to right (east to west):